Bump golang.org/x/net from 0.35.0 to 0.36.0 #2367
test.yml
on: pull_request
test_highlevel
2m 55s
test32
1m 8s
Matrix: test
Annotations
8 errors
test32
Process completed with exit code 2.
|
test (1.23)
Process completed with exit code 2.
|
test (1.21)
The operation was canceled.
|
test (1.21)
The strategy configuration was canceled because "test._1_23" failed
|
test (1.22)
The operation was canceled.
|
test (1.22)
The strategy configuration was canceled because "test._1_23" failed
|
test (1.24)
The operation was canceled.
|
test (1.24)
The strategy configuration was canceled because "test._1_23" failed
|