Skip to content

Fix: Maintenance Frequency Conversion #390

Fix: Maintenance Frequency Conversion

Fix: Maintenance Frequency Conversion #390

Triggered via pull request February 28, 2025 21:25
Status Failure
Total duration 1m 16s
Artifacts

ci-tests.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-latest, 3.9)
Process completed with exit code 1.
build (ubuntu-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
build (ubuntu-latest, 3.12)
The operation was canceled.
build (windows-latest, 3.12)
The job was canceled because "ubuntu-latest_3_9" failed.
build (windows-latest, 3.12)
The operation was canceled.
build (windows-latest, 3.9)
The job was canceled because "ubuntu-latest_3_9" failed.
build (windows-latest, 3.9)
The operation was canceled.