Test Plan

Author Gaël MALVAR
Created 11/17/2023
Last Modified 12/08/2023

📖 Table of content

This is the test plan for our version of Pac-Man coded in x86 assembly.

The purpose of these tests is to verify that the game works as expected and is playable. We'll detail how we'll test the game, what type of testing we'll do, and how we'll ensure the game works in the end.


Glossary

Term Definition
Smoke test A smoke test is a quick and basic check or test performed to verify that it works on a fundamental level. A smoke test ensures that the main functionalities of a program or system are operational without delving into detailed or exhaustive testing.
Functional test Functional testing is a process categorized as black-box testing. It constructs test cases based on the specified requirements of the software component under examination.
Regression test A regression test is a check to ensure that recent changes to a software application haven't negatively impacted its existing functionalities. It helps catch unintended side effects or "regressions" that might occur when new features or updates are added.
Unit test A unit test is a specific kind of testing conducted by developers on isolated components (units) of a software program. Developers create and execute unit tests to verify the correctness of individual functions or methods within the code.
Test case A "test case" is a specific set of instructions or conditions that are designed to determine whether a software application, system, or component functions correctly under certain circumstances. It's a detailed scenario or situation used to verify that the software behaves as expected.

Testing strategy

The strategy that will be used to test the game is to test it manually. The tester will have to test the game throughout the development phase and also afterwards in order to prevent the appearance of bugs and to be able to resolve them if there are any.

First, we'll run a smoke test to see if the basic functionality works. When the smoke test is successful, we will then perform a functional test to ensure all features work as expected. Then we will do a regression test after each new version to see if any new bugs appear.


Smoke test

This is a short description of the somke test we will perform

  1. Start the game
  2. Exit the game
  3. Movements
  4. Collision

The purpose of these tests is to verify and confirm that the main features of our game work well.

Functionality Test

Name of the test Description
Maze Navigation Verify that the player can navigate the maze, be able to use the tunnels, consume pellets, and escape from enemies.
Foes Behavior Ensure that the behavior of the foes works as expected for each of them.
Game Levels Check if the game progresses through levels correctly. The game should change level when the player eats all the dots.
Win The game should end when the player wins all levels.
Lose The game should end when the player loses all lives.
Live The number of lives should decrease when the player is eaten.
Score The score should increase when the player eats a dot, a pellet, or an enemy.

Compatibility Testing

Test Description
Cross-platform compatibility Test the game on various platforms and devices and ensure that the game is responsive.
Peripheral devices Test the game with different peripherals such as keyboards and controllers.

Performance Testing

Test Description
Movement and Controls Test the responsiveness and accuracy of player movement controls.
Load Testing Evaluate the time it takes for the game to initially load as well as the loading time between levels to ensure a smooth experience.
Stress Testing Push the game to its limits to identify any breaking points, such as excessive collisions or power-ups.

Schedule

This section is dedicated to the progress of the testing phase, including smoke tests, functionality tests and bug reports. The game will be tested throughout development and after each new version.

  • Project timeline :

Start of the project : 11/06/2023

Project deadline : 12/21/2023

Task Start date End date
Report bugs 11/27/2023 12/21/2023
Unit test 11/27/2023 12/21/2023
Smoke testing 12/04/2023 12/04/2023
Production of documents 11/17/2023 12/08/2023
Start of the test on the working prototype 12/11/2023 12/11/2023
Functionality test 12/14/2023 12/15/2023
Regression test after each new version 12/14/2023 12/21/2023

Test Cases

During the testing phase, all the tests carried out will be stored in the " TestCases.md" file.

Here is an example of a test case :

Test Case ID 1
Name Name of the test
Description Description of what should happen
Pre-conditions What conditions must be met before starting the test
Steps Step taken to obtain the expected result
Expected Result Expected result after the test
Actual Result Actual result after test
Status Test status (To test, In testing, Tested)
Priority The priority of the test (High, Medium, Low)

Testing tools

In order to test the game, we will use several tools.

Hardware

We will run and test the game on different machines, we have 3 at our disposal, 2 of the machines were provided by the school: the Lenovo and the MacBook, the 3rd was provided by a member of our team.

Lenovo ThinkBook :

  • ThinkBook 14 G4 IAP
    • Processor : 12th Gen Intel® Core® i7-1255U 1.70 GHz
    • RAM : 16.0 GB
    • System : 64-bit operating system, x64-based processor
    • Operating system : Windows 11 Pro ( Version : 22H2 )

MacBook Air :

  • MacBook Air 13″
    • Processor : Apple M1 chip
    • RAM : 8.0 GB
    • Operating system : macOS Ventura

Desktop computer :

  • HP compaq 500b mt
    • Processor : Intel® Pentium® E5400 2,7 GHz
    • RAM : 2 Go DDR3
    • Operating system : Windows XP SP3

Software

We will use different software to run the game, test it, report different bugs and resolve them.


Issues Report

Issue n°X

Date

MM/DD/YYYY

Description :

Actions performed :

Actions performed to reproduce the bug

Expected result :

What should happen when the program works as expected

Actual result :

What actually happened

Screenshot :

(if it gives additional informations)